![]() The MRP is used to ensure material availability by monitoring the stocks and creating procurement proposals for purchasing and production. When saving, the system creates a reservation for the required material. Materials with Item Category “L – Stock Item” are procured using Requirements planning. Procurement via MRP (Material Requirements Planning) for Stock items: When using direct procurement with item category “N”. When the goods are received, they are posted directly to the activity and do not go through the stock. ![]() Purchase requisitions are created for these components. Material with Item Category “N – Non Stock” are procured directly by the network activity. ![]() Various processes are available as detailed below: This allows automatic creation of purchasing data (Reservations and purchase requisitions) in logistics (MM module) in order to fulfill the requirements for the project. The SAP PS module is integrated with MM through the usage of networks. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |